KLM OCC SCHIPHOL
Project description
The scope of this project was engineering, fabrication en installation of mesh fabric sunscreen at the OCC-building at the KLM-site in Schiphol-East.
After the dismantling of existing steel plate façades, a façade construction was delivered and installed. The mesh fabric sunscreens were fitted onto the new façade construction, this on the 4 sides of the building all in various dimensions.
TYPE OF PROJECT
Revitalizing building
CLIENT
PolyNed commissioned by Sodexo
LOCATION
Amsterdam
PURPOSE
Flight Operations Control Center
COMPLETED
100 % completed: 24.01.2019
TYPE OF CONTRACT
Subcontractor
DURATION
Total 105 working days